Made to the standard your consultant names — EN 206, EN 13121, EN 15288 reference for public water areas — manufactured in mainland China, contracted through Hong Kong, delivered to Hamad Port.
Typical clients: developers, hotel groups, landscape contractors and government projects in Doha and Lusail. Failure on this scope is usually efflorescence, drainage and waterproofing detail, not the shell — which is what our submittal pack proves first.
YY DESIGN is a supplier and manufacturer of GRC / GRP planters and water features, not a Doha-registered contractor: we fabricate in our own plants in Foshan and Ningbo, contract through our Hong Kong entity, and supply to your main contractor or installer. Price is returned as a factory unit rate plus freight to Hamad Port, so a GRC / GRP planters and water features package for a Qatar project can be compared line by line against a local trader's quote instead of a lump sum. We quote projects in Doha and Lusail and hold the test reports and mill certificates that a Ministry of Municipality (MME) submission asks for. Lead time, pricing and project terms are confirmed per project against the drawing and the standard your consultant named.
Scopes we fabricate under this line: GRC planter, GRP planter, water feature, fountain nozzle, tree grate, roof terrace planter — each with its own fixing detail and test basis, so the submittal is prepared per scope rather than per catalogue page.
| Standard | Scope |
|---|---|
| EN 206 | concrete |
| EN 13121 | GRP where applicable |
| EN 15288 reference for public water areas | |
| IEC 60529 IP68 for submersible luminaires |
Reports are issued by accredited laboratories in the client's or consultant's name, so they can go straight into a Ashghal (Public Works Authority) and Kahramaa specifications package without a re-test request.
planter sizes, planting loads and finish sample. Send the city, the standard the consultant named, and the date the submittal is due — one page comes back with the comparison.
Yes. We design and prefabricate in mainland China, contract through our Hong Kong entity, and ship to Hamad Port. Most projects are installed by the client's contractor; we supply setting-out drawings, anchor details and a supervisor's checklist.
Primary tests: EN 206, EN 13121, EN 15288 reference for public water areas, IEC 60529 IP68 for submersible luminaires. Local gate: Ashghal (Public Works Authority) and Kahramaa specifications. Reports are issued in the client's or consultant's name.
Production, freight and sample dispatch timings are confirmed per project in the written agreement; sample and test report sets can be prioritised where the submittal is on the critical path.
planter sizes, planting loads and finish sample — plus the city and the standard the consultant named. A one-page comparison is prepared after review.
GRC is glass-fibre reinforced concrete: cement-based, heavy, and it reads as real stone or concrete, with a matt surface that takes a cast texture well. GRP is glass-fibre reinforced plastic: much lighter, moulded in a thinner wall, and better where weight matters — roof terraces, balconies, retrofits. GRC is the default for street-level public realm where mass and impact resistance are wanted; GRP is chosen when the structural allowance is the constraint. Both can be made to the same drawing; the detail that differs is the fixing and the drainage.
A planter is a reservoir with a hole in it, so the drainage has to be designed rather than drilled later. The usual arrangement is a filter layer, a drainage cell or gravel layer, a geotextile to stop fines washing down, and an outlet above the base so the lower zone can hold a small reservoir for the plants. On a structural slab the outlet must lead somewhere legal — not over the edge. In a rooftop or podium condition a detention layer is often added so the discharge rate is controlled.
Beyond dimensions and finish: the mix and the fibre content, the design compressive strength, the wall thickness, the reinforcement at lifting points, and the point loads used for handling and for the planter's own weight when saturated. GRC is a thin-wall material, so the specification has to state how it is lifted and what it is bedded on — most damage happens in handling, not in service. Also state the colour and texture reference and whether it is through-colour or a applied finish, because the repair method differs.
Size from the flow requirement, not the pump label: for a sheer descent the flow is set by the weir length and the film thickness wanted, for a jet by the nozzle's rated flow at its working pressure. Add the static head from the sump to the outlet, then the friction loss through pipe, fittings and any filter, and select a pump whose curve delivers the design flow at that total head. Most weak-looking features are not under-pumped — they are over-piped, with a long narrow suction run that the pump cannot pull through.
Saturated soil is the number that matters: a typical planting mix at 20% air-filled porosity sits somewhere around 1.0–1.3 tonnes per cubic metre when wet, plus the planter's own weight plus the plant and its root ball. A 600 mm deep GRC planter one metre square is therefore roughly a tonne before anything grows in it. That is why roof terraces use GRP or a lightweight aggregate mix, and why the structural engineer needs the saturated weight and the footprint, not the planter's nominal capacity.
Send the city, the scope and the date the submittal is due — Evan replies personally after reviewing your enquiry.
Prefer to ask first? Ask the AI assistant — answers in seconds →
Generated live from configuration on 2026-11-05 (content reviewed 2026-11-04) — approval authorities, codes and test basis update automatically when our standards file changes. © YY Design Group (HK) Co. Ltd