Made to the standard your consultant names — EN 1991-1-4, EN 1990, EN 1090-2 — manufactured in mainland China, contracted through Hong Kong, delivered to Sohar / Port of Salalah.
Typical clients: developers, hotel groups, landscape contractors and government projects in Muscat, Duqm and Salalah. Failure on this scope is usually anchor and base-plate uplift, not the steel section — which is what our submittal pack proves first.
YY DESIGN is a supplier and manufacturer of pergola and shade structures, not a Muscat-registered contractor: we fabricate in our own plants in Foshan and Ningbo, contract through our Hong Kong entity, and supply to your main contractor or installer. Price is returned as a factory unit rate plus freight to Sohar / Port of Salalah, so a pergola and shade structures package for a Oman project can be compared line by line against a local trader's quote instead of a lump sum. We quote projects in Muscat, Duqm and Salalah and hold the test reports and mill certificates that a Ministry of Housing and Urban Planning submission asks for. Lead time, pricing and project terms are confirmed per project against the drawing and the standard your consultant named.
Scopes we fabricate under this line: aluminium louver pergola, car parking shade, walkway canopy, poolside shade sail, restaurant terrace canopy, bicycle shelter — each with its own fixing detail and test basis, so the submittal is prepared per scope rather than per catalogue page.
| Standard | Scope |
|---|---|
| EN 1991-1-4 | wind, cl. 7.3 canopy cp,net |
| EN 1990 | load combinations |
| EN 1090-2 | EXC2/EXC3 |
| EN 13782 | tensile/temporary structures |
| ISO 1461 / ASTM A123 | galvanising |
| Qualicoat / AAMA 2604 | powder coat |
Reports are issued by accredited laboratories in the client's or consultant's name, so they can go straight into a Muscat Municipality and Oman Tender Board submissions package without a re-test request.
pergola drawings, slab/footing detail and wind zone. Send the city, the standard the consultant named, and the date the submittal is due — one page comes back with the comparison.
Yes. We design and prefabricate in mainland China, contract through our Hong Kong entity, and ship to Sohar / Port of Salalah. Most projects are installed by the client's contractor; we supply setting-out drawings, anchor details and a supervisor's checklist.
Primary tests: EN 1991-1-4, EN 1990, EN 1090-2, EN 13782. Local gate: Muscat Municipality and Oman Tender Board submissions. Reports are issued in the client's or consultant's name.
Production, freight and sample dispatch timings are confirmed per project in the written agreement; sample and test report sets can be prioritised where the submittal is on the critical path.
pergola drawings, slab/footing detail and wind zone — plus the city and the standard the consultant named. A one-page comparison is prepared after review.
EXC2 is the execution class under EN 1090-2 for structural steel and aluminium. Fabrication requires factory production control to EN 1090-1, traceable material certificates to EN 10204 3.1, qualified welders, and documented dimensional checks. Most Gulf shade structures fall in EXC2; EXC3 is only asked for when consequence class and seismicity push it there. If a consultant writes EXC2, the supplier must be able to hand over the FPC certificate, not just a mill certificate.
Canopy roofs are covered separately in EN 1991-1-4 clause 7.3 rather than as enclosed buildings. The net pressure coefficient depends on the blockage under the roof and the slope, and it can be suction-dominated — the roof is pulled up, not pushed down. That is why the governing check on a shade structure is usually base plate uplift and anchor pull-out, not the aluminium section. We size fixings from the local basic wind velocity, the exposure category and the actual open area, and show the calculation in the submittal.
In our experience the section is almost never the weak point. Failures concentrate at the base plate, the anchor, and the interface between a proprietary bracket and a site-cast slab — because the bracket was designed for a different substrate, or the anchor was selected by the installer rather than the engineer. A submittal that shows the anchor type, embedment, edge distance and the uplift capacity per support will catch this before fabrication. That drawing is the first thing we ask to see. It also sets the maintenance interval: anchors inspected at twelve months, then every two years, and the interval shortened where the structure sits in salt spray.
A submittal pack is the document set a consultant or municipality reviews before material is released. For outdoor works it usually contains: shop drawings with setting-out and anchor details, a structural calculation note, material and finish specifications, test reports from an accredited laboratory, mill certificates, an O&M manual, and a warranty statement. In the GCC it is reviewed by the consultant and then by the authority — Dubai Municipality, SASO/SABER, Ashghal or Muscat Municipality depending on the country. Missing one item sends the whole package back.
Start from the wind and the fixing, not the look. Take the local basic wind velocity and the exposure of the terrace, decide whether the roof is fixed or operable, then check what the slab can accept: an operable louver roof is roughly twice the dead load of a fabric canopy and needs a drainage path for rain. Only then pick the finish, because the finish is the cheapest thing to change later. For a hotel the third question is operations: who cleans it, how often, and can a single louver be replaced without removing the roof.
For the same covered area, a fabric tensile membrane is usually the lower capital cost: less steel, no louver mechanism, and a shorter erection. A louvered or solid pergola costs more up front but gives rain cover and a usable ceiling for lighting and fans, which a membrane cannot. The comparison only becomes honest when you price the support structure and the foundations together with the roof, because a membrane pulls up hard at its anchor points and can need more ballast than the louver roof it replaced. Ask for both figures on the same footprint and the same wind load.
Send the city, the scope and the date the submittal is due — Evan replies personally after reviewing your enquiry.
Prefer to ask first? Ask the AI assistant — answers in seconds →
Generated live from configuration on 2026-11-05 (content reviewed 2026-11-04) — approval authorities, codes and test basis update automatically when our standards file changes. © YY Design Group (HK) Co. Ltd